Feature sheet

ImpactEdge

Business continuity, BIA, CRQ, auto-pilot resilience.

DesignResilienceMVP target 2027 H1
Impact in money
Output
AEGIS + FAIR
Scoring
White-glove
Provisioning
ISO 22301
Standards
Walk the simulation →Request access, at launch← Back to the productPrint or save as PDF for a procurement pack.

What it is

ImpactEdge takes a business input and auto-produces the resilience chain: Business Impact Analysis → Cyber Risk Quantification → business continuity plan → disaster recovery. The CRQ engine (FAIR / Monte-Carlo) puts continuity risk in currency terms.

It is in design simulation now. Walk it and shape it before v1.0.

Who it is for

This section is being written for ImpactEdge. It names who the product suits and, more usefully, who it does not. We would rather leave it blank than fill it with something generic.

Capabilities

01
Auto-BIA

A business input becomes a tiered BIA (RTO / RPO / MTPD) automatically.

02
CRQ engine

FAIR / Monte-Carlo continuity risk, expressed in currency.

03
BCP and DR

Generated, testable continuity and recovery plans.

04
Dependencies and blast-radius

If X fails: what is exposed, worst concentration first.

Standards it follows

ISO 22301DORAFAIR

Release plan

FeatureMilestoneScope
Auto-BIA enginev1.0In MVP v1.0
CRQ (FAIR / Monte-Carlo)v1.0In MVP v1.0
BCP / DR generationv1.0In MVP v1.0
Blast-radius viewv1.1Planned

Milestones are roadmap targets rather than shipped dates. Target for MVP v1.0: 2027 H1. Provisioning is white-glove, never self-serve.

What these products establish, and what they do not

Every SecureEdge Advisory product prepares you for a certification, an audit or an assessment. None of them awards one. A certificate is issued by an accredited certification body, an attestation opinion by an independent auditor, and a regulatory finding by a regulator. We prepare the position and facilitate the process; the affirmation is made by someone else, and we do not blur that line.

Everything a product reports is derived from information supplied by your organisation, or by the person representing it. Ratings, maturity levels, readiness figures, mappings between frameworks and any monetary exposure are calculated from those inputs. Where an input is incomplete, out of date or optimistic, the output carries that forward faithfully. A result is therefore a structured statement of the position you have described, not an independent verification that the position is true.

An assessment is a documented position at a point in time. It is useful precisely because it is explicit about what it rests on, and it should be read that way rather than as a proof. Nothing here is a substitute for an audit, and no output should be presented to a regulator, a customer or a board as one.

SecureEdge Advisory
ImpactEdge

Part of a family of ten products sharing one governed control library. Provisioning is white-glove and scope follows a due diligence review.

secureedgeadvisory.com
cio@secureedgeadvisory.com
Dubai, United Arab Emirates